Scott's RV-14 Build

Vert. Stab Disassembly and Deburr

Diassembled the vertical stabilizer to deburr in accordance with the manual. Was somewhat depressing to take it all apart. It looked good all clecoed together! The thick spar doubler took forever. Slow going today. I think I'm going to prime all the internal ribs and spars with SEM and see how I like that.

Previous post:
Match Drilling Skins

This post is from Scott's RV-14 Build