N212DM - Ben's RV-12is Build

Inventory complete

I've completed a full inventory of every subassembly, modulo counting 12,000 rivets one at a time. I found the following discrepancies between the crate's contents and the packing list.

  1. Sub kit #4 is missing 2x HS-1230 Inboard Rib.
  2. Sub kit #5 has a surplus F-1211G-DT. I'll ask Van's about it but I doubt it's material (no pun intended).
  3. Bag 2664 is missing one NAS1149F0332P washer, but has one surplus NAS1149FN632P washer.
  4. Bag 2673-1 is missing one 4" plastic tie wrap.

Otherwise everything is correct and undamaged. There is one other thing I'll ask Van's, though, which is that in one of the bags, the 15 pop rivets which I believe should all be identical in fact has one "odd man out"; see picture below.

Previous post:
First order inventory First order inventory

This post is from N212DM - Ben's RV-12is Build

Next post:
Workshop cleanup Workshop cleanup