Carl's Bearhawk 4-Place

6-18-2023

Repair of Citabria - continued

We continue to work on the Citabria, at this point the RH wing is almost fully assembled and both ailerons are covered. Once we have the RH completed we will proceed to cover both wings using the Stewarts Covering System.

In the images I show a segment of the fixed LE being installed which is one of the STCs offerred by Millman along with the aluminum spar STC. The other picture is of the aircraft fuselage on which we have completed a lot of fabric repair along the belly and replaced the cabin floor panels.

Previous post:
5-7-2023 5-7-2023

This post is from Carl's Bearhawk 4-Place

Next post:
4-10-2024 4-10-2024