Flipped wing, finishing wiring work
Brought in team to flip wing and put into stands. Worked well.
We will have a 24V system. Finished wiring for GAP25 Probe (AWG16 wires with dedicated ground).
This post is from Kurt's Rans 21
Brought in team to flip wing and put into stands. Worked well.
We will have a 24V system. Finished wiring for GAP25 Probe (AWG16 wires with dedicated ground).
This post is from Kurt's Rans 21