Bryce's RV-10

Log: Vert Stab 6-3 (So much match drilling and deburring)

All the deburring

Today I was able to do the rough assembly of the vertical stabilizer. It was really exciting to see a piece come together on day 2 of building. As soon as I had the skin on it came time to do all of the match drilling of the skin/underlying skeleton. That did not take so much time but the deburring is already getting on my nerves. It just takes so much time.