12/10/19 - Jigs
Built several items today - a drill guide for the trailing edges, a bending jig for forming the edge of the trailing edges, a jig for holding control surfaces whilst riveting as the skin overhangs the edge preventing clamping to the work bench
Previous post:
11/10/19 Primer ordered
11/10/19 Primer ordered
This post is from Steve's RV-7