Adam Dickson

Pre-bolting of spar carry through

A precautionary measure to ensure no misalignments develop between the layers of the carry through as it is riveted into the fuselage. These wing bolts will be left in place throughout fuselage assembly. A check was also done to ensure alignment with the wing spar connections

This post is from Adam Dickson