Deburr, edge smooth, scrub and prime CF side rail assembly parts - part 7
Corner rounding done as usual. The rear parachute cable notches misalign slightly, but the gap is still wide enough to easily fit the 6mm cable. The strengthening angles CF-ANG-010 were left unprimed as there are still some hole mismatch issues to resolve, particularly at the connection to longeron 301
This post is from Adam Dickson