Entry: Wed Jan 24 2024
Completed 08-03 step 3 (torqued Inboard Hinge Bracket assembly to 23 in/lbs).
Completed 08-10, 08-11 all steps.
Holding on 08-12 step on as longer rivets are needed to securely attach the joggle in the front spar assembly. Placed order with Vans for AN426AD3-6 rivets.
This post is from David's RV-14
Next post:
Entry: Thu Jan 25 2024
Entry: Thu Jan 25 2024