Entry: Fri Jun 14 2024
Continued to work on the right elevator fairing. Awaiting arrival of Locktite 242 to apply to bolts holding counterweights.
This post is from David's RV-14
Continued to work on the right elevator fairing. Awaiting arrival of Locktite 242 to apply to bolts holding counterweights.
This post is from David's RV-14