N14EV - RV-14A

Entry: Fri Sep 30 2022

rivet flap brackets and torque tubes, drill, prep, and prime aileron brackets, prime left main ribs 14-06/1-3, 15-02/1-5, SB-16-03-28/15,20-25

Previous post:
Entry: Thu Sep 29 2022 Entry: Thu Sep 29 2022

This post is from N14EV - RV-14A