N14EV - RV-14A

Entry: Sun Oct 02 2022

Rivet left ribs to main spar, rivet torque tube to rib 14-07/3-5, 14-06/4

Cleco, final drill, and countersink left rear spar 15-04/2-4

Disassemble and rebuild right aileron inboard bracket because the bearing was binding more than I was comfortable with.

Previous post:
Entry: Sat Oct 01 2022 Entry: Sat Oct 01 2022

This post is from N14EV - RV-14A