N14EV - RV-14A

Entry: Thu Dec 29 2022

Finish fluting tank, final drill holes, drill too strainer flange holes 18-02/1-3

Previous post:
Entry: Wed Dec 28 2022 Entry: Wed Dec 28 2022

This post is from N14EV - RV-14A