N14EV - RV-14A

Entry: Tue Jan 31 2023

Finally prep and fill the tooling holes of the left inboard nose rib after two failed attempts at the -6 rivets. I ended up using soft rivets for this one. Rivet the fuel cap flange.18-04/7, 18-05/2

Previous post:
Entry: Mon Jan 30 2023 Entry: Mon Jan 30 2023

This post is from N14EV - RV-14A