N14EV - RV-14A

Entry: Sun May 26 2024

Finish riveting tunnel sides, rivet bulkhead, prep battery box 62-02/6B, 28-07/7-8, 28-08/1,4, 28-10/3

Previous post:
Entry: Sat May 25 2024 Entry: Sat May 25 2024

This post is from N14EV - RV-14A