Gary's Sling TSi

17 Mar 2023

Deburring, scuffing wing components and preparation for inspection

Deburred and scuffed wing rear spars, wing ribs 8 right and 10 right, rudder tip skin (replacement) and outer wing spar channels.

Torqued lower elevator control arm nut to 6.5nm and applied torque seal.

Prepared empennage for inspection.

Previous post:
12 Mar 2023 12 Mar 2023

This post is from Gary's Sling TSi

Next post:
18 Mar 2023