Gary's Sling TSi

22 Mar 2023

Riveted horizontal stabiliser and completed some wing ribs

Completed wing ribs 8 right and 10 right. Riveted horizontal stabiliser after checking alignment with lazer level (much faster this time!)

Previous post:
21 Mar 2023 21 Mar 2023

This post is from Gary's Sling TSi

Next post:
24 Mar 2023