26 Mar 2023
Elevator tips and control arm
Sanded elevator tips, cleco'd tip skins in place and then match drilled the composite tips to align with the tip skins. Alternated each side (top/bottom) to keep alignment as each hole was drilled.
Fitted elevator control arm and counterweights, torqued bolts to 6.5nm + 1.1nm drag = 7.6nm and applied torque seal. 1x AN3-5A bolt is not correct - too short - have contacted Sling for a replacement. Riveted the remaining control arm holes as required, note the two stainless rivets which are positioned between the AN3 bolts. I'm not too happy with the torque seal, it makes a mess. Perhaps this particular tube is problematic, but getting a nice clean stripe is impossible, the best I can manage is a blob.
Fitted elevator tip counterweights on each tip with a little help from some friends.