Gary's Sling TSi

29 Apr 2023

Fabricated pitot regulator brackets

Fabricated two brackets to secure the pitot heat regulator control unit to the left wing rib 9. Installed 2x M4 rivnuts in each and secured with Loctite 277. These brackets will also serve to hold the related wires in place.

Previous post:
28 Apr 2023 28 Apr 2023

This post is from Gary's Sling TSi

Next post:
30 Apr 2023 30 Apr 2023