21 May 2023
Assembled aileron and flaps
Assembled left and right flaps as per KAI
Assembled right aileron per KAI. Torqued the AN4 bolt securing the aileron pushrod eyebolt to 7.6nm and applied Loctite 243. Installed aileron balance tube.
Riveted lower side of all ribs except 3 and 4 to the left aileron skin. Still waiting for the pushrod spacers which were short supplied.