Gary's Sling TSi

21 May 2023

Assembled aileron and flaps

Assembled left and right flaps as per KAI

Assembled right aileron per KAI. Torqued the AN4 bolt securing the aileron pushrod eyebolt to 7.6nm and applied Loctite 243. Installed aileron balance tube.

Riveted lower side of all ribs except 3 and 4 to the left aileron skin. Still waiting for the pushrod spacers which were short supplied.

Previous post:
15 May 2023 15 May 2023

This post is from Gary's Sling TSi

Next post:
23 May 2023