Gary's Sling TSi

25 Sep 2023

Riveting and test assembly of rear fuselage components

Assembled rear fuselage longerons and cable tied them in place. Riveted ribs 3-6 to lower fuselage skin. Riveted tailhook bracket to rib 8 and longeron angle to rib 7 (these steps were omitted from the KAI).

Riveted right step supports in place and upper step supports for left side. Lower section needs to wait for the correct lower longeron to be supplied.

Installed rivnuts in the rudder box.

Test assembled the luggage extension and luggage bulkhead skin in the fuselage.

Previous post:
24 Sep 2023 24 Sep 2023

This post is from Gary's Sling TSi

Next post:
30 Sep 2023