Gary's Sling TSi

15 Nov 2023

Assembly of front floor section

Installed foam on the front bottom skin and front floor skin then riveted the floor skin in position onto the bottom skin.

Installed 12x M4 rivnuts with Loctite 277 at the rear of the front floor skin.

Riveted the control mount brackets in place, which was very tricky due to the confined space even using the close quarter rivet pulling wedge tool.

Riveted the z-section assembly in place.

Started assembly of the rudder pedals but encountered an issue with the alignment and bushes which I need to think through and contact Sling to discuss.

Previous post:
7 Nov 2023

This post is from Gary's Sling TSi

Next post:
18 Nov 2023 18 Nov 2023