Gary's Sling TSi

11 Sep 2024

Inspection of fuselage pre side skin installation

Inspection of fuselage completed by AP prior to installing the inside side skins. Permission granted to continue. Once the side skins are installed it is difficult to impossible to inspect the structure behind them.

Previous post:
8 Sep 2024 8 Sep 2024

This post is from Gary's Sling TSi