6 Apr 2026
Tail fairing installation & delivery of some parts for painting
Took the ailerons, flaps, rudder and wheel spats to the painter
Temporarily fitted the horizontal stabiliser, vertical stabiliser and then positioned the tail fairing in place. Drilled per the KAI, fitted M4 rivnuts with Loctite 277. Fitted the fairing cover for the ELT antenna
Filled and sanded some rivets on the wings, fuselage, and empennage
Fitted the BNC connected to the vertical stabiliser RG400 cable for the VOR antenna
Previous post:
21 Mar 2026
21 Mar 2026
This post is from Gary's Sling TSi