Jennifer's RV-14

Entry: Sat Sep 02 2023

I started fluting the right side outer ribs only to discover the right side baggage rib was actually a 2nd left side rib.

I bent the flanges on the idler bracket assembly and cut the bearing to fit

I spent the rest of the day dimpling and final drilling parts.

The aft fuselage was moved to the hangar to make room for the forward fuselage.

Previous post:
Entry: Fri Sep 01 2023 Entry: Fri Sep 01 2023

This post is from Jennifer's RV-14