Entry: Sat Sep 02 2023
I started fluting the right side outer ribs only to discover the right side baggage rib was actually a 2nd left side rib.
I bent the flanges on the idler bracket assembly and cut the bearing to fit
I spent the rest of the day dimpling and final drilling parts.
The aft fuselage was moved to the hangar to make room for the forward fuselage.
This post is from Jennifer's RV-14