John's Rans S-21 Outbound

Elevator trim tab

Assembled the elevator trim tab, after prep riveted the frame, then reassembled and balanced, removed some twist and match drilled. Can move tomorrow to deburring and final assembly/ riveting.

Previous post:
Elevator trim tab prep Elevator trim tab prep

This post is from John's Rans S-21 Outbound

Next post:
Trim tab fitting Trim tab fitting