Elevators continued
Building the Elevators progressing

Trim arm installed.

Trim motor mounted on bracket.

Hinge pin bent according to plans.

Bottom Trailing edge set aside for sealant to set, then the foam ribs will be inserted with Tank Sealant.

Left Elevator, both upper and lower skins are riveted. Now the foam ribs, trailing edge and leading edge are next.

Upper/lower skins ready for rivets.

Showing the special bucking bar from Cleaveland Tools, this is used to reach the rear spar rivets on the elevators. This tool is a must and worth the money.

Riveting the trailing edge of the Rudder Trim. I used special flat sets that are anchored on a spring (notice them laying just above the red rag), purchased from Cleaveland Tools. The edge came our perfect.