Elevator deburred and prepped
Everything taken apart, deburred, and mating surfaces scuffed up.
I also drilled out holes for zip ties to hold the wires leading to the trim tab servo. It will have two ties on each hole: 1 secured to the spar, and the other between the first tie and the wire. This should help prevent chafing

This post is from Mark and Cara's Zenith CH 750 STOL
Next post:
Elevator primed
Elevator primed