Mark's Zenith 650B

Entry: Sat Dec 03 2022

Spar mock up for rivet removal and reinstall learning and testing. Left spar rivets removed in preparation for upgrade kit components. Also built arbour press rivet tool for eventual reinstall.

Previous post:
Entry: Sun Jun 26 2022 Entry: Sun Jun 26 2022

This post is from Mark's Zenith 650B