Mark's Zenith 650B

Entry: Thu Apr 06 2023

Aileron layout completed. Skins predrilled. Ribs installed. Hinge upgrade installed and drilled. Skins trimmed to final size. Two extra ribs made for upgrade. 3D designed and printed counter balance arm hole locator. Next step, counter balance install.

Previous post:
Entry: Tue Mar 28 2023 Entry: Tue Mar 28 2023

This post is from Mark's Zenith 650B