Entry: Thu Jul 20 2023
nose ribs trimmed and aligned. Spar extension built up and installed. Unused L bracket removed according to LRO option drawing.
This post is from Mark's Zenith 650B
nose ribs trimmed and aligned. Spar extension built up and installed. Unused L bracket removed according to LRO option drawing.
This post is from Mark's Zenith 650B