Mark's Zenith 650B

Entry: Wed Feb 07 2024

wing releveled and nose skin clamped down. Spar rivet line drawn and triple checked. Holes at each rib/spar intersection drilled. Nose skin rivet lines located and pilot hole drilled.

Previous post:
Entry: Sun Jan 28 2024 Entry: Sun Jan 28 2024

This post is from Mark's Zenith 650B