Mark's Zenith 650B

Entry: Fri Jan 03 2025

L’s added to bottom skin. L’s added to upper aileron support box. Fuel tank fitted and drain holes drilled.

Previous post:
Entry: Mon Dec 30 2024 Entry: Mon Dec 30 2024

This post is from Mark's Zenith 650B