Phillip's Bearhawk 4 B

more vertical work

More progress today on the fuslage, the firewall has the diagonal tubes and 3 of the 5 engine mount tubes. The carry through tube at the main spar was put in to check fit as was the remaining firewall tubes and braces. Everything looks good and on the laser line center.

Previous post:
Taking shape Taking shape

This post is from Phillip's Bearhawk 4 B

Next post:
Panel Panel