Fuselage
Drilling
Attached hull inspection hatch frames with rivets and nuts .
Drilling of the upper skin above bulked 6 and 7.
Riveting of bulked 8.




Attached hull inspection hatch frames with rivets and nuts .
Drilling of the upper skin above bulked 6 and 7.
Riveting of bulked 8.