Tucano Replica #2106

Fuselage

Drilling , deburring and riveting

-Installation of the POM trunk guide that maintains the position of the table.

-Measuring, positioning, drilling and riveting of the hinges.

Previous post:
Fuselage

This post is from Tucano Replica #2106

Next post:
Fuselage Fuselage