Wing
Drilling and deburring
Drilling of the leading edge on the left wing and W-OM reinforcement between W-RBN-1 and W-RBN2, and after drilling, deburring and painting.
Drilling of the leading edge on the left wing and W-OM reinforcement between W-RBN-1 and W-RBN2, and after drilling, deburring and painting.