Fuselage
Drilling and deburring ,riveting
Installed metal arches required for the installation of the cover - no. 1 (FF-CC-A) - no. 2
(FF-CC-B right/left) - n.1 (FF-CC-CD) and n.1 (FF-CC-CS) .
Installed metal arches required for the installation of the cover - no. 1 (FF-CC-A) - no. 2
(FF-CC-B right/left) - n.1 (FF-CC-CD) and n.1 (FF-CC-CS) .