Tyler's Sling TSi

Day 8

Vertical Stabilizer Assembly.

Pulled the 14 rivnuts for the vertical stabilizer. Assembled the rest of the frame as far as parts were available.

Previous post:
Day 7 Day 7

This post is from Tyler's Sling TSi

Next post:
Day 9 Day 9