Tyler's Sling TSi

Day 32

Fuel Tank Testing & Elevator.

Cold weather is coming! Spent some time this morning hanging some plastic partitions in the shop and taping up the seams on the insulation. It’s supposed to get into the negatives this week, so going to try not to freeze.

Tyler took the long rang fuel tanks home with him to fill with water and check for any leaks. Hopefully tomorrow brings positive news.

To round off the day, we were able to finally finish the elevator! We were able to drill and fish wire through the trim tab hinge to keep the inner rod from vibrating free. Then Cleco’ed everything all back together and then buttoned everything up with rivets. Everything went well, other than it’s a little tricky getting some of the little tabs on the left lower side to line up without falling. But with a little patience got it to go. Very happy to have it finished.