Tyler's Sling TSi

Day 100

Paint Prep

We worked some more on preparing the wings for paint. We got the flap and aileron rivets filled for the left wing, as well as final scuffed them. Started working on the leading edge on the top of the right wing. Tomorrow we’ll finish the top of the wing and flip both wings over to do their undersides.

Previous post:
Day 99 Day 99

This post is from Tyler's Sling TSi

Next post:
Day 101 Day 101