Day 250
Interior
Been working to finish the interior. We have mounted the hand grips that showed up. We have one of them wired, and the other we’re waiting on some butt connectors.
We have also been working to get all of the various floor panels fitted. There are a number of holes that need rivet nuts and others that need match drilled. Then we have been working to upholster the parts we have fitted.
We have also started riveting in the rear floor skins. These also needed some match drilling and rivet nuts installed for inspection hatches.