512WH Bushby Mustang II

Entry: 2019-12-24

Started match drilling the flap hinge. Measured about 50 times before the first hole was drilled.

Previous post:
Entry: 2019-12-21 Entry: 2019-12-21

This post is from 512WH Bushby Mustang II

Next post:
Entry: 2019-12-24 Entry: 2019-12-24