Carl's Bearhawk 4-Place

5-7-2022

Engine Cowling - Pt 24

I located where the oil access door needed to be located and cutout the opening. Next I fabricated the new door from 2024-T3 0.032" aluminum and a doubler from 2024-T3 0.040" aluminum. 

The door will be hinged at the forward edge with a latch to secure it closed.

Previous post:
4-30-2022 4-30-2022

This post is from Carl's Bearhawk 4-Place

Next post:
5-14-2022 5-14-2022