5-14-2022
Engine Cowling - Pt 25
I installed the NACA ducts onto the lower engine cowling with sealant. Then I proceeded to complete the fabrication of the oil access door doubler then drilled and countersunk the fastener holes. I am using #3 rivets with a 1" spacing.