Kurt's Rans 21

Entry: Wed Jun 26 2024

Took off the bending tabs of the skins. DImpling nose rivets and skins, countersinking the front spar where needed.

Drill out two mis-set rivets on inspection rings. One rivet hole needs next size up due to spinning rivet enlarging the hole. Ordered 5/32 cherry rivets.

Dimpling the nose rivets was difficult as squeezer-yoke did collide with flange of lightning hole. Ground down a stack of washers to change position of yoke.

Previous post:
Samstag 2024-06-22 Samstag 2024-06-22

This post is from Kurt's Rans 21