Bryce's RV-10

Log: Rudder 7-6 Step 10-12

Almost done with the rudder parts

Other than counter sinking the trailing edge piece I spent the day deburring everything that I had missed. The two pieces that I needed for the vert stab arrived from Vans as well so I went through and prepped those for drilling and rough assembly.

This post is from Bryce's RV-10