Build times: Van's RV-10

Brendon's RV-10

Total Build Time
1329.7 hours

Avionics

Build time: 147.3 hours

in progress
65%

Firewall forward

Build time: 23.7 hours

in progress
15%

Engine

Build time: 10.2 hours

in progress
10%

Fuselage

Build time: 431.8 hours

in progress
75%

Miscellaneous

Build time: 2.5 hours

not started
0%

Canopy

Build time: -

in progress
30%

Electrical

Build time: 2.5 hours

in progress
50%

Painting

Build time: -

not started
0%

Upholstery

Build time: -

not started
0%

Tail

Build time: 386.2 hours

on hold
95%

Elevator

Build time: 111.7 hours

complete
100%

Horizontal stabilizer

Build time: 64.3 hours

complete
100%

Rudder

Build time: 47.4 hours

complete
100%

Vertical stabilizer

Build time: 40.1 hours

complete
100%

Wings

Build time: 338.3 hours

in progress
60%

Ailerons

Build time: 32.1 hours

in progress
80%

Flaps

Build time: 52.8 hours

complete
100%

Main wing

Build time: 175.1 hours

in progress
80%

Section build times

Section Status Time
(hrs)
Progress
Avionics in progress 147.3
65%
Firewall forward in progress 23.7
15%
Engine in progress 10.2
10%
Fuselage in progress 431.8
75%
Miscellaneous not started 2.5 -
Canopy in progress -
30%
Electrical in progress 2.5
50%
Painting not started - -
Upholstery not started - -
Tail on hold 386.2
95%
Elevator complete 111.7
100%
Horizontal stabilizer complete 64.3
100%
Rudder complete 47.4
100%
Vertical stabilizer complete 40.1
100%
Wings in progress 338.3
60%
Ailerons in progress 32.1
80%
Flaps complete 52.8
100%
Main wing in progress 175.1
80%
* If a parent section's time is greater than the sum of its sub-sections, it simply means one or more posts weren't categorized under a sub-section.

Build times by tag

Tag Build time (hrs)
horizontal stabilizer 51.8
Elevator 58.2
Wing 14.5
Tools 4.5
propeller 6
Priming 102.3
Match Drilling 46.4
Rough Assembly 6.8
Deburring 22.1
Dimpling 16.6
Control assembly 3.5
Trim 5.5
Wing Spars 30
Vertical Stabilizer and Rudder 1
Trim tab 7.1
Nutplates 7.3
Cleaning 7.9
Autopilot 7.5
Wings 22
Center Fuselage 18.5
leading edge 20.8
Drilling 25.5
Countersinking 37.9
Riveting 84
Torquing 2
Tailcone 66.1
Tie Down Bracket 7.3
Wing Ribs 9.8
Door assembly 1
Assembly 5

Build times by week