Brendon's RV-10

Feb 26 2023

Horizontal Stabilizer 8-2 Steps 1-4, 8-3 Steps 3-4

Completed the left and right spar attachment brackets in 8-3 steps 3 and 4. Got to break out the boelube for the first time. Seems to work great. Deburred the rear spar and doubler plate. Match drilled the holes for the doubler plate and the hinge brackets. Getting the clecos through the hinge bracket was a little tough but just needed a little twist to get it through the powder coat that was in the holes.

Previous post:
Feb 26 2023 Feb 26 2023

This post is from Brendon's RV-10

Next post:
Feb 27 2023 Feb 27 2023