Brendon's RV-10

Jan 16 2023

Elevator 9-6 Step 8, 9-7 Steps 1, 7-8

Received in the trailing edge wedge. Was able to match drill the trailing edge wedge on both the left and right elevators. Started disassembly on the right elevator.

Previous post:
Jan 14 2023 Jan 14 2023

This post is from Brendon's RV-10

Next post:
Jan 16 2023 Jan 16 2023